October 2011 Edition
Challenger 604: 192-Month Landing Gear Inspection
Some earlier S/N 604s are coming due for the 192-month landing gear restoration but may be confused with the 96-month repetitive cycle in the restoration requirement versus the 96-month Detailed Inspection requirements. » Read More |
ATA 34: Troubleshooting EFIS CAS Alerts After a Storm
After performing the standard shutdown and reboot of the aircraft to clear the fault, the CAS message still posted. » Read More
Dassault Supplemental Maintenance Manual
Dassault has published the Supplemental Maintenance Manual Chapter 5s, and operators are encouraged to update their logbooks. » Read More
Radar Antenna Alignment Procedures (DA-1203A)
Seven steps to radar antenna alignment (DA-1203A). » Read More
Primus II RM-850 Upgrade Program EndING 12/31/2011
Honeywell stopped production of the RM-850 Radio Management Units (RMUs) in 2006. Then on November 8, 2010, Honeywell announced there may not be enough suitable replacement parts for these RMUs to be repaired. » Read More
Earn IA Renewal Credit
The next Duncan Aviation Intelli-Conference is November 10 in Dallas, Texas. This is a face-to-face forum discussion with industry experts on hot industry topics as well as classes with Inspector Authorization (IA) renewal credit. » Register Here
About The Newsletter
This Duncan Intelligence Newsletter is a publication of Duncan Aviation, written by our technical experts. Please contact us with any questions, or if you have a topic that you would like to see discussed.
( Return to top )











Duncan Aviation-Lincoln Begins Construction on New Paint Facility
1988 Astra Classic For Sale 


