
According to a Falcon Service Advisory FSA-00-10-009-R12-E on the Falcon 7X aircraft, the mainship batteries are one of the main drivers for cancelled or delayed flights. Due to the design of the Falcon 7X electrical system, the #1 battery is solely responsible for the APU start.
We recommend swapping the position of the #1 and #2 batteries during the 12M capacity maintenance event in order to optimize their longevity.
Corrosion Repair For The Hydraulic Thrust Attenuator Actuator
The Crucial Role Of Safety Management Systems In Aviation MRO Safety
The Hidden Danger Of Loose Wires: Arcing Damage To Aircraft Starter & Generator Terminal Blocks
Incentives & Solutions Available As Gogo Phases Out Legacy ATG Network Technology
Aircraft Sales: Addressing Component Discrepancies During A Pre-Purchase Evaluation