Learjet 45: Coupe Rail Inspection
Bombardier has issued a recommended SB 45-56-3 that calls for the inspection of the windshield coupe rails on all Learjet 45 models.
Read More...
Bombardier has issued a recommended SB 45-56-3 that calls for the inspection of the windshield coupe rails on all Learjet 45 models.
Read More...
TCAS 7.1 is being offered as an upgrade by all of the major TCAS manufacturers and makes two important safety enhancements.
Read More...
In my experience as an Avionics Tech Rep, unless I am talking to the person who witnessed the squawk, I go under the assumption that there is always more to the story than what I am told.
Read More...
In an FAA Reduced Vertical Separation Minimum (RVSM) Notam dated March 9, 2011, operators of aircraft authorized to use RVSM airspace must conduct monitoring every two years or within 1,000 flight hours per aircraft, whichever period is longer.
Read More...
Dassault requires that after discharge of a fire bottle, whether by accident or intention, the rubber silicone nipple must be replaced.
Read More...
Duncan Aviation strongly recommends complying with Service Bulletin 196 or 024 to prevent the potential of severe corrosion of the Group 2 Fuel Tank.
Read More...
How to troubleshoot both systems when the Flight Director (FD) computer and Autopilot computer are combined into one.
Read More...
Because of the high probability of future corrosion around the fasteners of the front center panel ahead of frame 10, Duncan Aviation strongly recommends to comply with SB 392.
Read More...
December 31, 2012 is the deadline to replace the rear compressor spool in certain CF34-3A engines.
Read More...
The first step to troubleshooting an inoperable NAV is to identify the NAV source the pilot was using at the time of the failure.
Read More...
Six guidelines to assist in prolonging the service life of your business aircraft's maintenance laptop.
Read More...
The wiring harnesses for nose wheel anti-skid transducers are known to break down internally which can cause intermittent anti-skid issues.
Read More...
There is limited capacity for the Lear 40 & 45 8-year landing gear inspections coming due this summer.
Read More...
The regulatory requirements for a return to service for RVSM maintenance and inspections can be very confusing.
Read More...
We have successfully engineered the necessary tooling and test rigs for the 7X 48-month telescopic duct inspection requirement.
Read More...